Every QAB project runs through the same five phases, regardless of size, from a single villa to a 250-hectare master plan. Nothing here changes with scale except the size of the team.
We agree scope, fee and terms upfront, in writing, before a single drawing starts. No ambiguity to untangle later.
Budget, schedule and a full project management plan are locked before design work begins in earnest, including any outsourced scopes.
Concept moves through schematic and detailed design into full construction documentation, then out to tender. Every stage is a formal deliverable, not a work-in-progress file.
We track progress, quality and cost against the plan continuously, and manage change orders without losing control of either.
Every project ends with a formal handover, a team evaluation and lessons learned, plus a full project archive, not just a finished building and a closed file.
Design and construction are checked against standard before they move to the next phase, not after.
One version of every drawing and report, tracked and traceable across the life of the project.
Materials, shop drawings and vendor data are reviewed and approved on a fixed cycle, not on request.
Valuations and certifications run on schedule, so cash flow is never the thing holding a project back.